Cost and planning guide

San Jose ADU Requirements

San Jose ADU planning starts with property feasibility, ADU type, utility assumptions, drawings, and city review. Verify current rules before relying on any static guide.

Reviewed 2026-05-15

Guide

What homeowners need to know.

Start With Feasibility

Before you compare builders, confirm ADU type, lot constraints, access, utilities, existing structures, and whether a garage conversion, attached unit, detached unit, or junior ADU makes sense.

Drawings and Permits

Most serious ADU paths require permit-ready drawings and supporting documentation. Your provider should explain what is included, who responds to city comments, and what consultants might be required.

Builder Questions

Ask how many similar San Jose ADUs the provider has completed, how they handle utilities, whether they provide drawings, and what budget assumptions are included.

Cost table

Use ranges until scope is real.

Item Planning range Why it moves
Feasibility Early planning Confirms whether the project path is realistic.
Drawings Pre-bid requirement Needed for permits and meaningful bids.
Construction After scope is defined Depends on ADU type and site conditions.

Mistakes

Avoid these expensive shortcuts.

  • Assuming state ADU rules remove all local review
  • Ignoring utility and access constraints
  • Hiring a builder before clarifying who owns plans and permits

FAQ

Fast answers.

Can I rely on this page as legal advice?

No. Use it as planning guidance and verify current requirements with the city or a qualified professional.

What provider should I talk to first?

If you have no drawings, start with a planning, permit drawing, or design-build team that can review feasibility and cost.

What is the dumbest ADU shortcut?

Treating a contractor ballpark as a real budget before drawings, utilities, and site constraints are understood.